Installing photovoltaic power system at Ramallah church

Read the proposal

Read the proposal

Location

Ramallah – Palestine

 

Project code

GA 051/16

 

Brief summary

Due to the high cost of generating power and in order to reduce the high costs of electricity, the LPJ management staff is planning to install a photovoltaic power system for the Latin church in Ramallah. The engineering team recommends to install a 36 KW photovoltaic system that contains 111 modules of the Polycrystalline 325WP for each inverter. And an inverter capacity of 12 KW no. 3. The area required for installing the modules is 400 sq.

Proposed budget

USD 140,533